TY - RPRT TI - Collimator - test readiness review AU - Budasz, Jiří AB - This document describes the test procedure applicable to the overall functional test of the NEOSTED collimator.\nThe test to be performed according to this procedure are to demonstrate the compliance of the above item to the requirements specified in the applicable document as part of the overall verification program. The test results shall be collected in a Test Report. UR - http://hdl.handle.net/11104/0290549 UR - http://www.nusl.cz/ntk/nusl-390701 A2 - Václavík, Jan A2 - Tomka, David A2 - Mach, Marek A2 - Steiger, Lukáš A2 - Veselý, Martin A2 - Pleštil, Jan A2 - Kredba, Jan A2 - Kaván, František A2 - Psota, Pavel A2 - Lédl, Vít LA - eng KW - PLC system KW - collimator KW - telescope KW - interferometry PY - 2018 PB - Ústav fyziky plazmatu, Za Slovankou 3, 182 00 Praha 8, http://www.ipp.cas.cz/ ER -